大象影院

See how 大象影院 has helped people聽succeed

For decades聽customers have relied on 大象影院 to provide the right PLM solutions that聽enable them to succeed.


GDC Technics

Spearheads digital continuity with Dassault Syst猫mes鈥 3DEXPERIENCEplatform to manage both end customers鈥 aircraft modification wishes and certification authorities requirements

Challenge:

  • Shorten throughput times for customer change requests to lower costs for the customer and improve company鈥檚 competitive position.
  • Improve efficiency of engineering and certification departments鈥 working processes.
  • Simplify management of information for use by different departments.


Globe Trailers

Integrates design and simulation capabilities for trailer manufacturing with Dassault Syst猫mes鈥 3DEXPERIENCEplatform on the cloud

Challenge:

Lowboy trailer manufacturer Globe Trailers wants to double production volume in order to meet high demand, while meeting business goals for higher-quality products, with a globalized engineering team.

View Case Study


Amcor

Designs reduced-plastic bottles with Dassault Syst猫mes PLM

Challenge:

Amcor needed to deliver a wider variety of top-quality, innovative containers to its customers faster and at lower cost while demonstrating corporate and social responsibility.

View Case Study


Trek Bikes

Designs greener bikes faster with unified Dassault Syst猫mes鈥 PLM platform for composites

Challenge:

To remain the leader in the highly competitive bike industry, Trek Bikes
needs to get unique frame designs of superior durability and quality to
market in less time than ever before.

View Trek Composites Case Study

View Trek SIMULIA Case Study


Viking Range

Cooking up culinary excellence with Dassault Syst猫mes鈥 PLM

Challenge:

  • Develop more innovative products to maintain market leadership and customer loyalty.
  • Shorten development time to meet rapidly evolving customer demand
    Increase synergies and eliminate redundancies amount different product teams.
  • Reduce lead times for custom solutions.

View Case Study


Royal Canadian Mint

Accelerating the pace of innovation with V5 PLM and
Microsoft庐 Server Product Portfolio

Challenge:

  • Develop new products at a faster pace.
  • Engineer products right the first time.

View Case Study


ACT Aerospace

Cuts detailed design time 90% with CATIA for Composites

Challenge:

When ACT Aerospace used manual methods for detailed composite design, issues such as wrinkling and warping during layup required design changes that lengthened cycle times.

View Case Study


A-dec

Automating dental cabinetry design and production
with V5 PLM and Microsoft .NET

Challenge:

  • Eliminate production-system limits on manufacturing capacity.
  • Reduce errors by eliminating data re-entry at key transitions.
  • Improve customer service by reinstating custom order capability.
  • Capture 鈥渢ribal knowledge鈥 to improve accuracy and process control.

View Case Study


C&D Zodiac

Leveraging knowledge corporate-wide with Dassault Syst猫mes鈥 PLM

Challenge:

Identify and eliminate bottlenecks and hidden costs to minimize product development costs and support a highly competitive pricing structure.

View Case Study


Die Cad Group

Stamps out wasted time with CATIA V5

Challenge:

To design increasingly complex tooling while competing with low-wage offshore suppliers, Die Cad needed an efficient, powerful solution to cut costs by cutting time.

View Case Study


H茅roux Devtek

Collaboration with V5 PLM lands better design solutions

Challenge:

To maximize the opportunities created by close collaboration between engineering and manufacturing, H茅roux Devtek needed to bridge the physical distance between the two groups.

View Case Study


Triumph Composite Systems

Engineering efficiency soars by up to 30% with Dassault Syst猫mes鈥 PLM

Challenge:

Triumph Composites wanted to increase engineering productivity by reducing the time required to locate the latest version of files and manage manual, paper-based processes.

View Case Study


GID Development Corp.

GID models multiple 3D design options in a fraction of the time previously required…helping to nearly double profit margin per project.

Challenge:

GID Development Corp. needed solutions powerful enough to design a wide range of complex products quickly, and accurately convey the designs to overseas factories for right-first-time manufacturing.

View Case Study